About COWI
Contact COWI
Sitemap
COWI sites
ProjectPortal
Engineering, Environmental Science and Economics
Search
Home
Services
Projects
Publications
Jobs
News
Special features
Nature
Society
Transport
Buildings
Industry
Utilities
Projects
/
Buildings
/
Cultural and sports buildings
/
The Royal Theatre - new playhouse
Commercial buildings
Cultural and sports buildings
Educational buildings
Hospitals and health buildings
Residential buildings
The Royal Theatre - new playhouse
The Royal Theatre's new playhouse is an architectural masterpiece and will be a central attraction in the development of the Copenhagen waterfront into a recreational area on a par with cities like London and Amsterdam.
Architects Lundgaard and Tranberg have designed the challenging structure while COWI has developed a series of groundbreaking solutions which will help realize the artistic visions.
Innovative solutions
The physical location (partly in the harbour basin) generated some initial questions ranging from the risk analysis of ship collision to the carefully controlled ground water table lowering strictly limiting its effect on the surrounding older buildings of Copenhagen inner city.
Another extraordinary achievement is the roof floor of the playhouse where COWI's structural specialists have designed full storey height steel truss girders with total lengths reaching 85m, and with cantilevered spans as high as 26m or what amounts to a seven storey building.
The playhouse opened in early 2008 and includes a restaurant, a café and a large public area in the foyer and forecourt.
Want to know more?
Rene Moustgaard Kræmer
Project Director BU8
Tel.: +45 45 97 13 81
rkr@cowi.com
Facts about the project
Project scope:
A building of approx.
18,000 m2. Site area of approx. 21,500 m2. Three stages with a seating capacity of approx. 650, 200 and 100 respectively.
COWI's services:
All disciplines in the fields of structural, mechanical, electrical and civil engineering including indoor climate. Design according to performance based fire requirements and risk management.
Client:
The Danish Ministry of Culture
Architect:
Boje Lundgaard and Lene Tranberg Architects A/S
Project period:
2002 - 2008
Read more
Audiences will help heat the Playhouse
Behind the scenes at new theatre in Denmark
Alternative energy in the conceptual and planning stage
140 tonne steel girder erected in a single operation
Related websites
Watch slide show and read more about the Playhouse (text in Danish)