About COWI
Contact COWI
Sitemap
COWI sites
ProjectPortal
Engineering, Environmental Science and Economics
Search
Home
Services
Projects
Publications
Jobs
News
Special features
Nature
Society
Transport
Buildings
Industry
Utilities
Projects
/
Industry
/
Oil and gas
/
Offshore facilities
/
Oseberg Øst platform concept study
Environmental and social due diligence
Health, safety and environment
Industrial buildings
Oil and gas
Decommissioning
Offshore facilities
Transmission and distribution
Onshore facilities
Production and processing plants
Industrial project management
Industrial planning and logistics
Production and processing plants
Industrial IT and automation
Industrial production management
Industrial utilities
Oseberg Øst platform concept study
In January 1996 Norsk Hydro Exploration and Production awarded to COWI a contract for a concept study of a topside for Oseberg Øst platform. The Oseberg Øst is the fourth platform located in the Oseberg area. The distance to Oseberg Field Centre is 27 km, to Oseberg C 15 km.
The Oseberg Øst Platform concept consists of a combined, manned, drilling and production facility. For the drilling purpose a derrick, pipe rack and pipe handling equipment are provided with total operating load of approx. 1400 tonnes. The remaining drilling facilities are supplied from Tender Support Vessel (TSV) moored by the platform and connected with the topside by an enclosed bridge.
The Oseberg Øst platform is equipped with 6 oil producing, 6 water injecting, 2 water producing and 4 spare slots/wells. The separation equipment is limited to 1st stage separator. Produced oil and gas is then transported via pipelines to Oseberg Field Centre for further processing.
Water lifted from the Utsira reservoir combined with the produced water is re-injected into the reservoir. For this purpose 2 x 4 MW electric motor driven injection pumps are provided.
A gas compression train consisting of three electric driven compressors is installed with delivery pressures suitable for gas injection, gas lift and Utsira water lift, at pressures of 325 bara, 210 bara and 80 bara respectively.
The electric power supply is provided by three generators, a gas turbine driven 25 MW main generator, a diesel driven 3 MW essential generator and a diesel driven 1 MW emergency generator.
Want to know more?
Johnny Mikkelsen
Head of Department, Oil and Gas
Tel.: +45 45 97 27 49
jmi@cowi.dk
Lars Hansen
Chief Project Manager, Oil and Gas
Tel.: +45 79 18 17 80
lahs@cowi.dk
Facts about the project
Project period:
1996
Client:
Norsk Hydro Exploration and Production
Services rendered by COWI:
Preparation of technical input to Development Plan PUD) incl.: Layout study of topside, well-bay layout study, sizing of main process equipment, sizing of utility systems, equipment selection, concept design of topsides structure including flare boom, power demand study, topside weight estimate
Topside key data:
Topside size (LxWxH m): 62x32x13
Including accommodation and helideck: 62x32x24
Topside weight (dry): 4750 t
Accommodation: 38 pers.
Number of slots: 18
Gas injection pressure: 325 bara
Water injection pressure: 240 bara
Design rate (single well): 6000 Sm3/Sd
Flare boom (inclined 30°): 90 m