The construction works have been organised in three Bid Packages, and tender documents have been prepared for international competitive bidding according to ADB procurement rules have been prepared.
All equipment and services for upgrading of the installations at the power plants. The main items are speed controlled pumps, motors, frequency converters, electrical transformers, valves, pressure holding system, and water treatment equipment. Also the CMS is included in this package.
A turnkey contract comprising all equipment and services for the hydraulic separation of the consumer installations from the network, auto-matic control of consumer loads (heat exchangers and control equipment), hydraulic balancing of installations, metering and upgrading of existing substations.
Includes works related to reinforcement of the distribution pipe network.At the present date (1999) the bidding/tender evaluation procedure is in progress. Construction works are anticipated to commence in year 2000.