COWI led the design joint venture, and was responsible for the design of the cable stayed bridge superstructure, substructure and foundations for the bridge and the main crossing approach viaducts.
The bridge opened on schedule in October 2017, and was officially opened by HM The Queen and the Duchess of Sussex on 14 June 2018.
LOCATION:
Liverpool, UK
PERIOD:
2012-2018
CLIENT:
Halton Borough Council
CONTRACTOR:
Samsung-FCC-Kier JV
COWI'S SERVICES: