"Engineering and construction of a big hospital is a complex and challenging assignment. It involves many different disciplines and areas of expertise.
You always have the important social mission of developing a new hospital in mind. Such a project has a significant impact on the population and all those working in the health services."
Tom Daniel Berg Engen , Construction Engineer with a Master's Degree in Societal Safety Engineering
Designing and building a hospital has several of the elements known from traditional buildings. But, in addition, you have functions such as laboratories, operating rooms, imaging diagnostics and a helicopter landing pad, as well as logistics functions, such as bed automatons, AMRs (autonomous mobile robot) and warehouse automatons and so on. There is an incredible amount of exciting technology in a hospital, which constitutes a significant infrastructure under the hospital itself.
The New Stavanger Hospital (or 'Nye SUS' as we call it) is one of the most exciting construction projects in Norway. Its first stage, with 128,000 m² of buildings, began in 2015 and was completed in November 2025. The construction pit was blasted out in early spring 2019, and the concrete work began that summer.
In terms of digitalisation, Nye SUS has been a very ambitious project. Everything has been completed as a fully digital project designed as building information modelling (BIM).
If you are an engineer or specialist with experience in hospitals or pharma, we are looking for people to join Tom and his teams. Check out these open positions:
Junior/Senior RIB Bergen og Haugesund
Lead Architectural Project Manager - Data Centres
Mechanical Lead - Data Centres
From the beginning, we set out to deliver a paperless hospital project that would be a world leader in BIM and industrial engineering. The functionality of the software has been continuously developed to make sure the levels of detail and information contained in the BIM model were always sufficient and up-to-date.
This level of digitalisation means great opportunities for efficient production on the construction site. We had BIM stations placed across the site to give contractors direct access to the latest drawings. In that way, contractors can retrieve what belongs to their contract to order materials and plan prefabrication and assembly well in advance of start-up.
Furthermore, we have aimed for a very high degree of standardisation and prefabrication of elements, which is relatively new in hospitals. All patient bathrooms have been made entirely from premade elements that were delivered on the building site like flatpacks – similar to what you know from furniture. One of the contractors made a 'pop-up factory' on site to optimse the production of pillars.
I believe Nye SUS is one of the most exciting construction projects ever to be completed in Norway. We have had many complex systems that had to exist together and have worked intensively with the interaction between many highly technical systems. And I'm happy and proud to say we succeeded – along the way, we actually won the BIM World Cup in 2019.
Working on this project has been both challenging and educational. COWI has strong hospital expertise and has built up a lot of experience by being involved in several hospital projects or projects in related areas, such as the pharma industry.
To be leading experts, we have to be at the forefront of BIM and digitalisation. We have an internal 'hospital school' where advisors with extensive hospital experience are matched with younger engineers that are skilled in modelling and digitalisation. The young will shape the hospitals of the future, but they need guidance from experienced hospital planners.
This culture of collaboration, learning and development between disciplines lifts the entire industry. We work fully integrated in a team with the architects and, of course, very closely with the customer. It's a mutual effort that leads to a flow of improvements that may seem individually small, but together, they add up to significant lifts, not just in how we work with hospitals but with big buildings and construction in general.
I have been involved in the project for seven years and have performed tasks within risk management, progress planning, contract follow-up, preparation for diagnostic imaging, follow-up during the construction phase and, in recent years, project management for the design group. My educational background, which is a mix of engineering and social sciences, has been very useful in these varied roles. A project like this has a lot of interaction in the relationship between people, technology and organisation.
Personally, I also find it very motivating to work with something truly meaningful. A hospital – healthcare – is not just designing pipes and channels, but about ensuring good treatment for patients. My work plays a part in one of society's important functions, and I feel I am part of something bigger than my profession.
Headquarters
COWI A/S
Parallelvej 2
2800 Kongens Lyngby
Denmark
Shortcuts
Sustainability and governance
Terms of use