Across North America, COWI delivers integrated water infrastructure solutions that protect people, communities and the environment. We design and support critical assets, such as dams and hydraulic structures, along with complex water and wastewater tunnels that ensure reliable service today and resiliency for the future. We enter into close dialogue with our customers and apply our global expertise to secure solutions that address the most pressing water challenges of our time.
COWI partners with communities and utilities across North America to design and upgrade water and wastewater tunnels that protect public health and support daily life. Our teams help deliver safe, reliable underground infrastructure that secures clean water supply, manages wastewater responsibly and minimizes disruption at the surface.
We combine our global tunnelling expertise with close local collaboration to help communities build resilient systems prepared for future growth and climate pressures.
Mill Creek Drainage Relief Tunnel
The Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel is a five-mile-long stormwater tunnel that will provide 100-year flood protection for nearly 2,200 commercial and residential properties in East Dallas when completed in 2029. The tunnel is designed to carry a maximum flow of 9 million gallons (34 million liters) per minute. This provides exponential relief from flooding during large rain events.
COWI served as the geotechnical and structural designer as well as the engineer of record for the tunnel, laterals and shafts. The work also included developing a subsurface investigation plan and preparing a geotechnical baseline report.
Annacis Water Supply Tunnel
Spanning 1.5 miles (2.4 km), the Annacis Water Supply Tunnel is designed to significantly improve the resiliency and reliability of water delivery for 3 million residents in Metro Vancouver, particularly during seismic events.
COWI designed two deep vertical shafts and the connecting tunnel, constructed using a 15.3 ft (4.67 m) diameter tunnel boring machine. Working in highly challenging geotechnical conditions, the project required innovative shaft designs with slurry walls, a comprehensive dewatering strategy and carefully planned excavation methods. All solutions were supported by detailed structural and geotechnical analyses, ensuring long-term performance and safety.
Lake Ouachita Water Supply Tunnel
Hot Springs, Arkansas, has faced water issues for years. Now, the Lake Ouachita Water Supply Tunnel transports water directly from Lake Ouachita to the treatment system, improving water infrastructure and security for the city’s 38,000 citizens.
The project features an approximately half-mile-long and 60-inch-wide tunnel bored through Blake Mountain. A 54-inch steel intake pipe gravity-feeds up to 23 million gallons a day. The tunnel carrier pipe was installed using a 61-in (1.55 m) direct steerable pipe thrusting method. The tunnel serves as a critical, high-capacity water source and is an integral part of a USD 150 million, 17-mile water improvement project for the Hot Springs water utility system.
Securing water supply for New York
The Gilboa Dam Low Level Outlet Tunnel enhances emergency drawdown capacity, improving dam safety and resiliency for the Schoharie Reservoir. The critical upgrade of the reservoir helps secure the drinking water supply for 9 million citizens in New York City and upstate New York.
COWI served as the tunnel designer and engineer of record, providing structural and geotechnical design, subsurface investigation, and baseline reporting, supporting efficient construction, effective risk management, and long-term performance of this vital infrastructure. The project delivers improved safety, reliability, and resiliency through a new high-pressure tunnel, shafts and intake structures designed to withstand extreme hydraulic demands and complex ground conditions.
Potomac River Tunnel
The DC Clean Rivers project is designed to capture and clean wastewater during rainfalls before it reaches rivers in the Washington area, and the Potomac River Tunnel is the final major component. This 5.5-mile-long (8.9-km) tunnel includes four drop shafts and seven combined sewer overflow connections.
COWI leads the design of the tunnel and horizontal access tunnels and provides geotechnical support for the entire project. Two advanced tunnel boring machines are used for construction in some of the most sensitive and complex urban and geological conditions in Washington, DC.
COWI works with communities and authorities across North America to plan, design, and upgrade dams, locks and hydraulic structures that protect lives, livelihoods and vital water resources. Our teams help ensure safe flood control, reliable water management, and long-term resiliency for towns, cities and rural areas.
By combining global expertise with local collaboration, we manage risk, extend asset life and adapt critical infrastructure while safeguarding communities and preparing for future water and climate challenges.
Folsom Dam Auxiliary Spillway
The Folsom Dam Auxiliary Spillway will help prevent flooding for 500,000 citizens in Sacramento, California. The new spillway increases flood release capacity and allows more flexibility and controlled release of excess water through its 1,100-ft approach channel, six-gate control structure, 3,000-ft spillway chute and stilling basin. Excavation proceeded through challenging foundation materials, including historic fill, lake sediments and hard granitic rock, while rapidly changing reservoir levels necessitated underwater excavation.
COWI supported URS/AECOM with structural and geotechnical engineering for the approach channel and spur dike, addressing hydraulic loading, seasonal water level fluctuations and the project’s complex excavation requirements.
Syphon Reservoir in California
COWI, together with GFT, is leading construction management for the Syphon Reservoir Expansion in Southern California. The project will increase recycled water storage from 578 to 5,000 acre-feet, strengthening long-term drought resiliency for Irvine Ranch Water District (IRWD). By enabling greater use of recycled water and reducing reliance on imported supplies, the expansion supports sustainable water management while delivering lasting value to communities across central Orange County.
Responsibilities encompass constructability reviews, support during the contractor bidding process, contract administration, resident engineering, quality assurance, and risk management. The team will also support IRWD’s environmental monitoring and public outreach initiatives.
Chickamauga Cofferdam Lock replacement
The Chickamauga Lock on the Tennessee River needed replacement due to structural deficiencies and deterioration. The lock is vital to the navigation, transportation, economy, commerce and recreation in East Tennessee. COWI completed feasibility studies, value engineering and detailed design for an innovative landward cofferdam that enables in-the-wet construction while maintaining navigation. The design addressed space restrictions, deep excavation in complex geology, lateral stability and flood risk.
COWI evaluated conventional, float-in and lift-in alternatives, identifying concepts capable of multimillion-dollar savings. The precast modular cofferdam later became part of the permanent lock structure.
Anderson Dam Tunnel Project
COWI provides construction management for the Anderson Dam Tunnel Project, helping Santa Clara Valley Water District enhance regional flood protection and water safety. The new tunnel will enable rapid emergency drawdown and support the future seismic retrofit of the 1950s-era dam.
COWI oversees construction of key infrastructure and supports community and environmental work, contributing to a safer, more resilient water system for Santa Clara Valley residents. The project includes a new outlet system featuring a 1,700-ft underground tunnel, lake tap, outlet structure, discharge channel, reservoir rim and bank stability upgrades, intake improvements, plus road work, utility relocation, traffic control, revegetation and community outreach.
Olmsted Locks and Dam
The Olmsted Lock and Dam project replaced aging infrastructure on the Ohio River, significantly improving navigation safety and efficiency on the busiest stretch of U.S. commercial inland waterways. As part of a joint venture, COWI provided detailed design services for the navigation dam and construction design support for the precast yard, including the marine skidway. We developed construction alternatives and supported selection of the in‑the‑wet construction method.
The dam consists of a 654-ft-long tainter gate spillway and a 1,400 ft gated navigable pass, two boat abutment sections, a fixed weir section, and upstream and downstream scour protection. The team addressed major seismic demands, large river level fluctuations and the need to maintain navigation during construction.
Transportation
COWI is a trusted partner in planning, designing and delivering transportation infrastructure that strengthens connectivity and supports sustainable growth across North America. Drawing on decades of global expertise and strong local presence, we support public and private customers throughout the project lifecycle.
Water
Across North America, COWI delivers water infrastructure solutions, designing dams, hydraulic structures, and water and wastewater tunnels through close customer collaboration, applying global expertise to ensure reliable service, long‑term resiliency and solutions to water challenges.
Federal infrastructure
COWI offers engineering consultancy to federal agencies across North America. In Canada, we work with Parks Canada to inspect and maintain bridge assets. In the United States, we partner with the U.S. Navy, delivering resilient marine infrastructure.
Climate resiliency
COWI helps customers across North America strengthen climate resiliency through coastal protection and flood control, assessing risk, adapting infrastructure, and protecting communities, assets and ecosystems with robust strategies for extreme weather and rising sea levels.
Renewable energy
COWI supports North America’s energy transition through engineering services for offshore wind, green fuels, microgrids and waste‑to‑energy. We combine global expertise and local insight to help customers reduce emissions and strengthen energy security.
Working at COWI in North America is much more than just a job.
Read about your new colleagues and learn more about career opportunities and our unique work culture.
Check out our open positions, or send us your CV to register your interest.
Thomas Dahlgren
President & CEO of COWI North America
Jack Gerwick
Senior Business Development Director, North America
Aamer Akram
Vice President, Head of Projects, North America
Anne-Marie Langlois
Vice President, Head of Engineering, Canada
Genaro Velez
Vice President, Head of Engineering, USA
Nolana Greaves
Head of P&O, North America
Sam Cobden
Head of Business Finance, North America
COWI North America Inc.
88 Pine Street/Wall Street Plaza, 4th Floor
New York, NY 10005
+1 646 545 2125
Headquarters
COWI A/S
Parallelvej 2
2800 Kongens Lyngby
Denmark
Shortcuts
Sustainability and governance
Terms of use