Photo: NYSTA
The new Governor Mario M. Cuomo Bridge was designed to replace the functionally obsolete Tappan Zee Bridge.
This design-build project helped address today’s needs with additional traffic lanes, greater pedestrian access, the ability to support an additional deck for rail loading and future needs through an enhanced 100-year service life design.
LOCATION:
New York, USA
PERIOD:
2013-2018
CLIENT:
HDR Engineering, Inc.
COWI'S SERVICES:
Don Bergman
Vice President, Senior Project Director
Bridges, Canada
Tel:
+1 604 986 1222
dwb@cowi.com